There s a 6 ft single.
Cost of building a breeze block garden wall.
We are renovating an unattractive pebble dashed bungalow with a part brick and part decorative breeze block front garden.
If building a wall in the rear garden and all the bricks and other material have to be carried through the house this could add many hours to the job.
Other factors which will increase the cost include ease of access.
Brick is one of the cheapest materials to build a wall with but the price can often double when using stronger or thicker materials.
To estimate costs for your project.
If you get a landscaper to build a garden wall which is 1m high by 4m long prices can range from 750 for coping 1000 for flint and 1200 for slate.
On average you can multiply the material cost by 5 to get the installed price.
For walls above 500mm in height the thickness should ideally be double skinned with piers for added strength.
The cost of the bricks will also make a big difference to the total building costs so choose the bricks carefully.
Can an old brick and breeze block garden wall be rendered or clad.
Concrete block wall material prices.
Actual costs will depend on job size conditions and options.
Can anyone advise me if there is an official height at which you would have to double a breeze block wall.
You will need at a minimum 140mm block with piers every 2 3m so worst case 252 blocks for basic wall plus about another 120 block for 14 piers so 372 for block 372 laid ton of sand and 10 cement 80 100.
This figure excludes the cost of the materials so to get a rough idea of how much the work costs you just need to work out how much sand cement.
Concrete block wall costs zip code sq.
Costs below are for wall material alone.
Retaining walls above 900mm in height should be designed by a structural engineer.
Upon examining the data we noticed that most brickies charge between 200 300 per day for a team of two people.
For walls up to 500mm in height you can build a single skin wall with multiple piers for added stability.
Usually a wall above 4 will require engineering.