Stamped or stenciled patterns engraving exposed aggregate finishes colored concrete and concrete staining are just a few of the ways you can enhance your sidewalk.
Concrete landing front door.
A top landing is not required where a stairway of not more than two risers is located on the exterior side of the door provided that the door does not swing over the stairway.
A typical pad has a 4 inch layer of gravel underneath and about 4 inches of concrete on top.
Before you begin determine the location for the pad and remove any sod.
Deep in the direction of travel with an exception for juliet balconies accessed only by door and the landing can be sloped for drainage or construction tolerance up to 1 4 in.
When building a landing for deck stairs typical codes require the pad to extend beyond the steps about 36 inches behind the steps about 12 inches and on the sides of the steps about 6 inches.
I ve got a building with several exterior doors all opening inward.
This landing must be at least the width of the door and 36 in.
With concrete the decorative options for entrance walks are endless.
Make sure you re able to check for level and square mix concrete and smooth out a concrete surface.
The slab and walk up is about 18 from the ground.
Doors other than the required egress door shall be provided with landings or floors not more than 7 3 4 inches 196 mm below the top of the threshold.